Pig line configuration examples

Process-led planning from lairage to chilling

The configurations below are planning illustrations, not photographs or descriptions of delivered customer projects. Equipment scope and throughput remain to be determined from verified inputs.

Example A: new single-species facility

Arrange animal entry, process stages, inspection, by-product routes and chilling as one continuous planning exercise. Review utilities and drainage before fixing machine locations.

Example B: existing building upgrade

Map existing columns, levels, rail supports and retained equipment. Identify transfer gaps, cleaning access and cold-room interface before proposing new stations.

Example C: staged equipment procurement

Define the complete process and reserve the interfaces first. Equipment can then be discussed in groups without leaving incompatible rail, utility or working-height connections.

For a relevant illustration, send a dimensioned site plan and the intended process route through the contact page.